Mineral Separation Spirals

Mineral Separation Spirals

Service Overview

Accurate gravity separation on surface. Our mineral separation spirals are used for gravity concentration, especially for coal, chrome and iron ore.

Our spiral concentrators are designed for accurate separation and minimal product loss. We recommend what works, including refurbished spirals that give a long service life at a fraction of the cost of new equipment.

What we supply

  • Gravity concentration of coal, chrome and iron ore
  • New and refurbished spiral units
  • Polyurethane hydrocyclones for desliming and classification
  • On-site support across key mining regions
From flow to force, movement to protection, we deliver mining solutions that keep your operation running strong.
Mineral Separation Spirals

Spiral banks in service at a South African processing plant.

Mineral Separation Spirals

New spiral units ready for delivery to site.

What a spiral circuit needs to work

A spiral separates by density as slurry flows down a helical trough. Heavy particles settle into the slower inner band and light particles are carried outward. That only works when the feed is in the right size range, at the right density and split evenly between starts. Most underperforming spiral plants have a feed problem, not a spiral problem, so this service covers the units that prepare and distribute the feed as well as the spirals.

Products in this service

ProductRole in the circuitKey specification (Songatech data)Product page
Spiral concentratorsRougher, cleaner and scavenger separation5-7 turns, 600-950 mm, single to triple start, about 0.3-4 t/h per startSpiral concentrators
HydrocyclonesDesliming and classification ahead of spiralsModular PU sections, spigots and apex linersHydrocyclones
Classifier nozzlesClassification and desliming in chrome plants2.5 mm standard orifice, ceramic, porcelain or PUClassifier nozzles
Launders and distributorsEven feed split between spiral startsCeramic, PU or rubber lined, custom outletsLaunders and distributors

Matching spirals to the ore

Size range

Spirals treat feed from about 0.1 mm to 3 mm, with the best results typically between 0.3 mm and 2 mm. Below about 45-75 μm, slimes follow the water and dilute the concentrate, so desliming cyclones are placed ahead of the spirals. Coarse particles above the range ride out to the tailings regardless of density.

Density difference

Separation is easiest when the valuable and gangue minerals differ widely in density, as with chromite or haematite against silicates. Coal spirals work in reverse: the product is the light fraction and the target is ash rejection. Each duty uses a different trough profile, which is why Songatech supplies separate chrome, iron ore, coal and mineral sands profiles.

Circuit stages

A typical layout runs roughers to produce a bulk concentrate, cleaners to raise grade, and scavengers to recover what the roughers lose. Middlings are often recycled. The chrome spiral plant design guide works through bank sizing and water balance, and the spiral selection guide covers profiles and starts.

New or refurbished

A spiral wears where the heavy band runs. Once the wear surface thins, the trough profile changes and the bands move, which shifts the cut. If the fibreglass body is sound, the unit can be refurbished with a new wear surface and splitters. New units make sense for plant expansions, profile changes or bodies that are cracked or distorted.

Commissioning and tuning

Spirals are tuned with feed rate per start, feed density and splitter position. Change one at a time and sample across the product bands before and after. The iron ore spiral troubleshooting guide gives a fault-finding order that applies to most ores.

How the work is scoped and quoted

  • Ore type, head grade and target grade and recovery.
  • Feed tonnage, particle size distribution and percent solids.
  • Existing spiral make, model and number of starts, if replacing or refurbishing.
  • Available plant height and floor area for the bank layout.
  • Desliming arrangement and cyclone or nozzle sizes in use.

Frequently Asked Questions

Built to last. Delivered on time. Local stock and fast lead times keep your plant running.

  • How many spiral starts do I need?
    Divide the feed tonnage by the capacity per start for your ore. Songatech spirals typically handle about 0.3 to 4 t/h per start depending on the ore, so a test or reference duty is used to fix the figure.
  • Why is my spiral concentrate grade dropping?
    Common causes are slimes in the feed, feed density outside the normal range, uneven distribution between starts, worn trough surfaces and splitters set in the wrong position. Check them in that order.
  • Which minerals can spirals separate?
    Spirals are widely used for chrome, iron ore, coal fines and mineral sands such as ilmenite, rutile and zircon, wherever the valuable and waste minerals differ clearly in density.
  • Do refurbished spirals come with new splitters?
    Refurbishment restores the wear surface and splitters so the trough holds its profile. The scope depends on the condition of each unit, which is checked first.
  • How do I request a quotation?
    Call 010 555 0828, email admin@songatech.co.za or use the quote form on our contact page. Send us your drawings or dimensions and we will match the product to your equipment.
  • Do you keep stock locally?
    Yes. Local stock at our Alrode head office and fast lead times mean consistent service and immediate distribution to mining operations.
  • Do you offer on-site support?
    Joint ventures and a strong regional presence let us offer tailored on-site support across South Africa's key mining regions and neighbouring countries.